Skip to main content
Live Projects

Property

Project Tumbler — USD 15m Asset-Backed Financing, Industrial Facility in Central Java

Debt mandate: USD 15m of asset-backed financing for an export manufacturing facility in Central Java, available as a senior secured term loan (six-year tenor, 24-month interest-only grace then 48-month amortisation, first-ranking mortgage over land, building and machinery) or as a sale-and-leaseback with buy-back (purchase at USD 15m against an indicative market value of USD 20m, seven-year leaseback and an operator buy-back right at USD 20m). Security is a 9.36 ha industrial complex on eight contiguous titles with rights to 2054, a 32,000 m² building and installed plant — USD 23.2m of fixed assets at book value, an indicative 65–75% LTV on land and building alone. Sponsor is an Asia-Pacific manufacturing group of about 30 years standing, 98% owner, supplying blue-chip global beverage and sportswear brands. The borrowing entity is pre-revenue and at production start-up, with the final manufacturing licence (IUI) pending. Blind teaser; identities and the data room follow an NDA.

Asking price
USD 15m financing sought
Sector
Property
Constraints
The borrowing entity is pre-revenue and at production start-up, with the final manufacturing licence (IUI) pending
Listed date
October 16, 2026

Process

  1. Teaser
  2. NDA
  3. Information pack
  4. Management meeting

Register interest

Confidentiality notice

Project information is indicative and subject to change. Counterparty details remain confidential and further information may be shared at Nata Advisory's discretion.

Related mandates

  • Property · Listed Sep 17, 2026

    Data centre land (data center land) for sale in Cikarang, Bekasi, Greater Jakarta: a 95.8 ha data centre zone within a 350 ha developable campus, across five plots of 12–24 ha suited to hyperscale and AI data centre deployment. Adjacent to an existing 500 kV GISTET and 150 kV GIS substation, with 475 MW of subsystem reserve documented by PLN (not yet allocated). Dual-train 2 × 50 L/s water treatment, six mapped fibre routes to cable landing stations and Jakarta data centre hubs, and a Special Economic Zone (KEK) application pending. Land at IDR 7m per m², or contributed for shareholding. First serviced plot six months from signing.

    View project